(KESC) ELECTRICITY CONTROL ORDER, 197852

(KESC) ELECTRICITY CONTROL ORDER, 197852

Notification No. S.R.O. 1108 (1)/78 – (Gazette of Pakistan, Extra. Part II, 13.9.1978). — Whereas under conditions of emergencies arising on account of shortage in the supply of electrical energy due to break down of two numbers of generating units on the Karachi Electric Supply System it appears to the Chief Engineering Advisor and Chairman, Federal Flood Commission, Government of Pakistan, to be necessary and expedient for maintaining supplies essential to the life of the community to provided for regulating the consumption and production of electrical energy, under such conditions;

Now, Therefore, in, exercise of the powers conferred on him by section 2 of Electricity Control Ordinance, 1965, read with the Government of Pakistan, Ministry of Water and Power Notification No. S.R.O. 777(1)/78, dated the 18th June, 1978, the Chief Engineering Advisor and Chairman, Federal Flood Commission of the Ministry of Water and Power, Government of Pakistan is pleased to make the following Order, namely :–

1.         (1) This Order may be called the Electricity Control Order, 1978 (KESE).

(2)        It shall come into force at once and shall remain in force for so long as so long an emergency in supply of electrical energy continues in KESC licensed area.

2.         In this Order, unless there is anything repugnant in the subject or context:-

(a)        ‘commercial establishment’ means an establishment in which the business of advertising, commission or forwarding is conducted, or which is a commission agency, and includes a joint-stock company, an insurance company, a banking company or bank, a broker’s office and a stock exchange ;

(b)        ‘industrial consumer’ means a factory which is run, wholly or in part, by electrical energy ;

(c)        ‘industrial establishment’ means a workshop or other establishment in which the           work of making altering, ornamenting, finishing, packing or otherwise treating any       article or substance, with a view to it use, sale, transport, delivery or disposal is         carried on or where such service is rendered to a consumer ;

(d)        ‘peak hours’ means the hours between 5:30 p.m. to 9:30 p.m. in winter (1st October to 31st March) and between 6:30 p.m. to 10:30 p.m. in summer (1st April to 30th September) ;

(e)        ‘shop’ means any premises used wholly or in part for the wholesale or retail sale of commodities or articles or services are rendered to customers, and includes an office, a store-room, godown, warehouse or place of work, whether in the same premises or otherwise, mainly connected with such trade or business ; and

(f)         ‘KESC’ means the Karachi Electric Supply Corporation.

3.         No light for decoration, advertisement or display shall be lit during the peak hours by, in outside any industrial or commercial establishment, shop, cinema-house, theatre or other place of entertainment, eating house, restaurant, hotel or market place.

4.         KESC shall ensure that in the case of street lights within the limits of its jurisdiction not more than fifty per cent of the installed electric lights on each street are lit.

 

5.         All the agricultural tubewells run by electrical energy shall remain of during the peak hours.

6.         Industrial consumers except for continuous process and three shift industries shall adopt and strictly observe staggering of weekly holidays within the KESC licensed area, in accordance with the programme of weekly holidays to be notified by KESC from time to time.

7.         Consumers of electrical energy having their own generating plants shall urn to their maximum safe capacity on notification by KESC

8.         Single and double shift industries shall adjust their working hours in such a way that these are switched off during the peak hours.

9.         Industrial consumers, except for continuous process industries and spinning mills, shall cut their load by 20% during peak hours.

10.        All air-conditioners, except those installed in cinemas, hotels and hospitals shall remain switched off during the peak hours.

11.        Clauses 9 and 10 will apply only in case of “extreme emergency” which shall be notified by KESC.

error: Content is Copyright protected !!
Josh and Mak International
Privacy Overview

Dear website visitor,

We use third-party cookies on our law firm website to enhance your browsing experience and provide you with relevant content and services. Third-party cookies are created by domains other than our website and are used for various purposes, such as tracking website analytics and serving targeted ads. The third-party cookies we use on our website are provided by Google Analytics, a web analytics service provided by Google, Inc. Google Analytics uses cookies to analyze how visitors use our website and provide us with reports on website activity. The information generated by these cookies is transmitted to and stored by Google on servers in the United States. We also use third-party cookies to serve targeted advertisements to website visitors. These cookies are provided by advertising networks and allow us to deliver advertisements that are relevant to your interests. By using our website, you consent to our use of third-party cookies as described in this policy. If you do not wish to accept cookies from our website, you can disable or delete them through your browser settings. However, please note that disabling or deleting cookies may affect your browsing experience and prevent you from accessing certain features of our website. If you have any questions or concerns about our use of cookies, please contact us using the contact details provided on our website. Thank you for visiting our website.

Best regards,

The Josh and Mak Team